True/False Indicate whether the
statement is true or false.
|
|
1.
|
To create the Window Schedule
for the residential project you will start an existing schedule and modify the
fields.
|
|
2.
|
When placing lights on the
ceiling, the symbols shown will also provide light inside the room when the view is
rendered.
|
|
3.
|
When drawing the lines for the perimeter of the house in Warm-Up #1, it is
possible to type in the length of the line at the line is being adding to the drawing?
|
|
4.
|
After creating a Rectangle using the Draw panel tool, it may be moved by picking
on only one of the four lines.
|
|
5.
|
Room tags are placed before the
room is created.
|
Multiple Choice Identify the
choice that best completes the statement or answers the question.
|
|
6.
|
After creating the door
schedule, you will need to add fields to the schedule. Which of the following is not one of the
fields used in the door schedule?
a. | Family | c. | Thickness | b. | Head | d. | Count |
|
|
7.
|
What method is used to aid in
spacing the dimensions the correct distance from the walls?
a. | Use two or three squares placed at
the midpoint of the walls. The dimension lines are then located at the edge of the
shapes. | c. | Use two or three
triangles placed at the corners of the walls. The dimension lines are then located at the edge of the
shapes.
| b. | Use two or three circles placed at the corners of the walls. The dimension
lines are then located at the edge of the shapes. | d. | Use two or three ellipses placed at the midpoint of the walls. The dimension
lines are then located at the edge of the shapes. |
|
|
8.
|
What is the name of the tool
used to add missing dimensions to an existing chain of dimensions?
a. | Add Dimension to
Chain | c. | Edit Witness
Lines | b. | Add Witness Lines | d. | Modify Dimension Chain |
|
|
9.
|
For the Site Plan view, what is
the main reason for lowering the bottom of the view range and the view depth to a negative value of
-10’-0”?
a. | To see the door and window openings
on the floor plan. | c. | To be all to see
all of the contour lines of the topography. | b. | To see the elevation
lines. | d. | To be able to see the colors of the materials for the
grass and concrete driveway. |
|
|
10.
|
When saving the drawing files for the tutorial, you should save them
_______.
a. | at the beginning of the tutorial | c. | after every major
change | b. | every 30 minutes | d. | all of the above |
|
|
11.
|
What is the name of the tool in
the Manage tab, Settings panel that would be selected to remove the 0’ in front of the value
for linear dimensions that are less than one foot?
a. | Project
Units | c. | Suppress feet
display | b. | Calculated | d. | Remove Zero |
|
|
12.
|
When placing a ceiling in the
project, what are the two methods that may be used?
a. | Pick the walls surrounding the room;
Sketch the ceiling outline. | c. | Pick inside the room; Right-click on the room in the project browser and
select “Ceiling…”. | b. | Pick inside the room; Sketch the ceiling
outline. | d. | Pick the walls surrounding the room;
Right-click on the room in the project browser and select
“Ceiling…”. |
|
|
13.
|
When using the Snap function, which of the following shapes indicates that the
user has snapped to the midpoint of an object?
a. | Square | c. | Circle | b. | Hexagon | d. | Triangle |
|
|
14.
|
The name of the tool used to connect a line to another line without affecting
the second line/element is called the _________ tool.
a. | Trim/Extend to corner | c. | Trim/Extend Single Element | b. | Mirror | d. | Array |
|
|
15.
|
To create the custom counter
top, what is the basic sequence of steps and tools used? (Not all steps and tools are
shown.)
a. | Component tool, Model In-Place,
Extrusion Tool, choose the Family Category, draw the shape, click the Green
Check | c. | Component tool, choose the Family
Category, Model In-Place, Extrusion Tool, draw the shape, click the Green
Check | b. | Model In-Place, Component tool, choose the Family Category, Extrusion Tool,
draw the shape, click the Green Check | d. | Component tool, Model In-Place, choose the Family Category, Extrusion Tool,
draw the shape, click the Green Check |
|
|
16.
|
After completing the front and plan views for the Warm-Up Exercise, you are
required to place the views onto a sheet. What tab contains the tool to begin this process?
a. | Sheet Composition | c. | Sheet | b. | Load | d. | View |
|
|
17.
|
What type of line is used when drawing the views for the Warm-Up
projects?
a. | model line | c. | drawing line | b. | detail line | d. | annotation line |
|
|
18.
|
The default material for the
topography is _______.
a. | Concrete | c. | Water | b. | Grass | d. | Earth |
|
|
19.
|
When dimensioning the exterior
walls of the house, the witness lines are located at the _________.
a. | center of the
core | c. | inside face of
core | b. | outside face of core | d. | outside face of wall |
|
|
20.
|
When adding kitchen cabinetry
to the project, what should you do if the cabinet size is not available in the family
choices?
a. | Download a family with the correct
size from the bimobject.com site. | c. | Create a new size by editing the size in the Type Properties dialog
box.
| b. | Create a new size by editing the size in the Project
Browser. | d. | Download a family with the correct
size from the Revit family folders. |
|
|
21.
|
In the type properties for the
stairs, each step will have a run of ______ inches minimum and a rise of ______ inches
maximum.
a. | 11; 7 | c. | 12; 7 | b. | 11; 5 1/2” | d. | 10; 7 |
|
|
22.
|
When adding the railings for an
existing stair, the ________ tool is used to make sure that the railing
will follow the slope of the stairs.
a. | Pick Existing
Host | c. | Pick
Stair | b. | Pick New Host | d. | Select Old Host |
|
|
23.
|
Refer to Warm-Up Exercise #2 when answering this question. What tool is used to
quickly copy the upper left corner of the object to the correct location on the upper right
corner?
a. | Mirror – Pick Axis | c. | Copy – Draw
Axis | b. | Mirror – Draw Axis | d. | Move |
|
|
24.
|
The default cut plane setting
for a reflected ceiling plan is set to _______ above the associated floor level.
a. | 4’-0” | c. | 8’-6” | b. | 7’-6” | d. | 10’-0” |
|
|
25.
|
When creating the front door for the Warm-Up Exercise #1, two hidden lines are
required. What snap mode is used to help place the left endpoint of the line exactly at the halfway
point?
a. | Endpoint | c. | Midpoint | b. | Halfpoint | d. | Equalpoint |
|
|
26.
|
What type of view is used when drawing the projects for the initial Warm-Up
projects?
a. | model view | c. | drafting view | b. | drawing view | d. | beginning view |
|
|
27.
|
Prior to placing the footers
around the edge of the slabs, you must first load a _______ from the families folder on the network
drive.
a. | symbol | c. | drawing | b. | slab type | d. | profile |
|
|
28.
|
When using a tool in Revit, sometimes a green tab will appear with specific
commands related to the tool. This tab is known as a(n) _________ tab.
a. | Specific | c. | Helpful | b. | Contextual | d. | Assistance |
|
|
29.
|
What view option in the
Properties box is used to show a gray scale view overlapping the current view?
a. | Overlip | c. | Overdone | b. | Underlap | d. | Underlay |
|
|
30.
|
When tagging the doors on the
floor plan, the final location of the tags for doors around the exterior of the house should be
________.
a. | on top of the door
symbol | c. | halfway between the exterior wall
and the first dimension line | b. | on the inside of the room/space that the door is
located | d. | to the right of the door approximately 1/16” from
the exterior of the wall
|
|
|
31.
|
According to the Residential
Tutorial, when at 1/4” = 1’-0” scale, dimensions are placed _____ feet from the
wall for the first dimension line and then spaced _____ feet from the first dimension line to the
second.
|
|
32.
|
What is clicked first to modify
the location of the object when using a dimension that has been used to annotate the
size/location?
a. | The object to be
modified. | c. | The dimension line
that is controlling the size/location of the object. | b. | The extension line that is attached to the
object. | d. | The dimension text of the dimension that is controlling
the size/location of the object. |
|
|
33.
|
When calculating the square
footage totals for the room finish schedule, the _______ checkbox in the _________ tab must be check
first.
a. | Calculate totals;
Appearance | c. | Calculate totals;
Formatting | b. | Calculate totals; Fields | d. | Calculate area; Filter |
|
|
34.
|
What tab contains the tool to place dimensions on the drawing.
a. | Dimension | c. | Annotate | b. | Analyze | d. | Architecture |
|
|
35.
|
What is the name of the tool
used to create the concrete driveways and walkways on the surface of the
topography?
a. | Subregion | c. | Subsurface | b. | Region | d. | Pad |
|
|
36.
|
What is the name of the tool
and option used to create the raised concrete platform in the garage?
a. | Component, Place a
Component | c. | Component,
Concrete | b. | Component, Create Platform | d. | Component, Model In-Place |
|
|
37.
|
If you are having trouble
placing the ceiling in a room, this may be due to _______.
a. | incorrect ceiling
material | c. | incorrect height
of the floor | b. | incorrect height of the walls | d. | incorrect thickness of the floor |
|
|
38.
|
In the Draw panel, what tool is used to place a triangle based on the distance
from the center to one of the corners?
a. | Inscribed Polygon | c. | Corner Polygon | b. | Circumscribed Polygon | d. | Edges Polygon |
|
|
39.
|
The name of the tool used to quickly join to intersecting lines together is
called the _________ tool.
a. | move | c. | trim/extend to corner | b. | mirror | d. | join line |
|
|
40.
|
When adding a field to the door
schedule that is not one of the available fields, you must create your own. To start this process
what is the name of the button that you will click first?
a. | Add
Parameter… | c. | Add
--> | b. | Calculated Value… | d. | Add Field… |
|
|
41.
|
To create a new door schedule,
you must go to the ______ tool in the ______ panel to begin the process.
a. | Create;
View | c. | View;
Create | b. | Schedules; Create | d. | Schedules; View |
|
|
42.
|
The template file that is used for the first Warm-Up exercise is
________.
a. | Default | c. | Residential Template | b. | Construction Template | d. | Commercial
Template |
|
|
43.
|
What is the name of the tool
used to create the gypsum-filled area for the ceiling in Lighting Plan exercise?
a. | Create
Region | c. | Masking
Region | b. | Filled Region | d. | Pattern Region |
|
|
44.
|
When setting up the roof
framing plan view, most of the view is __________ to allow for the elements to be added to be more
visible.
a. | hidden | c. | shown in red | b. | darkened | d. | grayed out |
|
|
45.
|
What dialog box contains the
setting to change the Elevation Swing to a hidden line style for all elevation views in the
project?
a. | Object
Styles | c. | Visibility/Graphics
Overrides | b. | Manage | d. | Additional
Settings |
|
|
46.
|
When adding stairs to the
project the first point is located at the _______ of the stairs.
|
|
47.
|
For the Residential Project,
the Project Base Point is used to ___________.
a. | locate the start point of the walls
of the structure | c. | locate the lower
left corner of the boundary of the property | b. | locate the base height of the
topography | d. | locate the upper right edge of the
topography |
|
|
48.
|
When creating the interior
elevation view of the stairs and railing, what must be done to see the portion of the stairs that
located behind the wall?
a. | The graphics for the wall are to be
overridden so that it will be placed behind the stairs. | c. | The graphics for the wall are to be overridden so that it will be
hidden. | b. | The graphics for the stairs are to be overridden so that it will be
transparent. | d. | The graphics for the wall are to be
overridden so that it will be transparent. |
|
|
49.
|
When sketching the boundary of
the garage slab the edge of the slab is placed ________ in relation to the exterior
walls.
a. | at the center of the
framing | c. | at the inside edge
of the framing | b. | at the inside edge of the gypsum board layer | d. | at the outside edge of the
framing |
|
|
50.
|
When creating a room from two
spaces such as the Living Room and Family Room, you must include a _________ line to separate the
spaces.
a. | Room
Divider | c. | Room
Separator | b. | Room Spacer | d. | Room Segmenter |
|