Multiple Choice Identify the
choice that best completes the statement or answers the question.
|
|
1.
|
What is clicked first to modify
the location of the object when using a dimension that has been used to annotate the
size/location?
a. | The extension line that is attached
to the object. | c. | The dimension line
that is controlling the size/location of the object. | b. | The object to be
modified. | d. | The dimension text of the dimension
that is controlling the size/location of the object. |
|
|
2.
|
After creating the door
schedule, you will need to add fields to the schedule. Which of the following is not one of the
fields used in the door schedule?
a. | Family | c. | Count | b. | Thickness | d. | Head |
|
|
3.
|
If you are having trouble
placing the ceiling in a room, this may be due to _______.
a. | incorrect height of the
floor | c. | incorrect height of the
walls | b. | incorrect ceiling material | d. | incorrect thickness of the floor |
|
|
4.
|
What is the name of the tool
and option used to create the raised concrete platform in the garage?
a. | Component, Create
Platform | c. | Component,
Concrete | b. | Component, Model In-Place | d. | Component, Place a Component |
|
|
5.
|
To create the custom counter
top, what is the basic sequence of steps and tools used? (Not all steps and tools are
shown.)
a. | Component tool, choose the Family
Category, Model In-Place, Extrusion Tool, draw the shape, click the Green
Check | c. | Model In-Place, Component tool,
choose the Family Category, Extrusion Tool, draw the shape, click the Green
Check | b. | Component tool, Model In-Place, Extrusion Tool, choose the Family Category,
draw the shape, click the Green Check | d. | Component tool, Model In-Place, choose the Family Category, Extrusion Tool,
draw the shape, click the Green Check |
|
|
6.
|
What is the name of the tool in
the Manage tab, Settings panel that would be selected to remove the 0’ in front of the value
for linear dimensions that are less than one foot?
a. | Suppress feet
display | c. | Calculated | b. | Project Units | d. | Remove Zero |
|
|
7.
|
What is the name of the tool
used to create the concrete driveways and walkways on the surface of the
topography?
a. | Pad | c. | Subregion | b. | Subsurface | d. | Region |
|
|
8.
|
When adding a field to the door
schedule that is not one of the available fields, you must create your own. To start this process
what is the name of the button that you will click first?
a. | Add
Field… | c. | Calculated
Value… | b. | Add Parameter… | d. | Add --> |
|
|
9.
|
The name of the tool used to quickly join to intersecting lines together is
called the _________ tool.
a. | join line | c. | mirror | b. | move | d. | trim/extend to
corner |
|
|
10.
|
When calculating the square
footage totals for the room finish schedule, the _______ checkbox in the _________ tab must be check
first.
a. | Calculate totals;
Fields | c. | Calculate totals;
Appearance | b. | Calculate totals; Formatting | d. | Calculate area; Filter |
|
|
11.
|
When creating the front door for the Warm-Up Exercise #1, two hidden lines are
required. What snap mode is used to help place the left endpoint of the line exactly at the halfway
point?
a. | Equalpoint | c. | Endpoint | b. | Midpoint | d. | Halfpoint |
|
|
12.
|
When adding stairs to the
project the first point is located at the _______ of the stairs.
|
|
13.
|
When adding the railings for an
existing stair, the ________ tool is used to make sure that the railing
will follow the slope of the stairs.
a. | Pick Existing
Host | c. | Pick
Stair | b. | Pick New Host | d. | Select Old Host |
|
|
14.
|
The default cut plane setting
for a reflected ceiling plan is set to _______ above the associated floor level.
a. | 10’-0” | c. | 7’-6” | b. | 4’-0” | d. | 8’-6” |
|
|
15.
|
Prior to placing the footers
around the edge of the slabs, you must first load a _______ from the families folder on the network
drive.
a. | drawing | c. | symbol | b. | slab type | d. | profile |
|
|
16.
|
The template file that is used for the first Warm-Up exercise is
________.
a. | Commercial Template | c. | Residential Template | b. | Construction Template | d. | Default |
|
|
17.
|
What dialog box contains the
setting to change the Elevation Swing to a hidden line style for all elevation views in the
project?
a. | Object
Styles | c. | Visibility/Graphics
Overrides | b. | Additional Settings | d. | Manage |
|
|
18.
|
Refer to Warm-Up Exercise #2 when answering this question. What tool is used to
quickly copy the upper left corner of the object to the correct location on the upper right
corner?
a. | Copy – Draw Axis | c. | Move | b. | Mirror – Pick Axis | d. | Mirror – Draw
Axis |
|
|
19.
|
When creating the interior
elevation view of the stairs and railing, what must be done to see the portion of the stairs that
located behind the wall?
a. | The graphics for the wall are to be
overridden so that it will be placed behind the stairs. | c. | The graphics for the wall are to be overridden so that it will be
transparent. | b. | The graphics for the stairs are to be overridden so that it will be
transparent. | d. | The graphics for the wall are to be
overridden so that it will be hidden. |
|
|
20.
|
What tab contains the tool to place dimensions on the drawing.
a. | Annotate | c. | Architecture | b. | Analyze | d. | Dimension |
|
|
21.
|
When adding kitchen cabinetry
to the project, what should you do if the cabinet size is not available in the family
choices?
a. | Create a new size by editing the
size in the Type Properties dialog box.
| c. | Download a family with the correct size from the Revit family
folders. | b. | Download a family with the correct size from the bimobject.com
site. | d. | Create a new size by editing the size in the Project
Browser. |
|
|
22.
|
When creating a room from two
spaces such as the Living Room and Family Room, you must include a _________ line to separate the
spaces.
a. | Room
Separator | c. | Room
Divider | b. | Room Spacer | d. | Room Segmenter |
|
|
23.
|
The default material for the
topography is _______.
a. | Concrete | c. | Earth | b. | Water | d. | Grass |
|
|
24.
|
The name of the tool used to connect a line to another line without affecting
the second line/element is called the _________ tool.
a. | Trim/Extend Single Element | c. | Trim/Extend to
corner | b. | Array | d. | Mirror |
|
|
25.
|
When dimensioning the exterior
walls of the house, the witness lines are located at the _________.
a. | inside face of
core | c. | outside face of
wall | b. | outside face of core | d. | center of the core |
|
|
26.
|
In the Draw panel, what tool is used to place a triangle based on the distance
from the center to one of the corners?
a. | Edges Polygon | c. | Circumscribed Polygon | b. | Corner
Polygon | d. | Inscribed
Polygon |
|
|
27.
|
When using a tool in Revit, sometimes a green tab will appear with specific
commands related to the tool. This tab is known as a(n) _________ tab.
a. | Helpful | c. | Specific | b. | Assistance | d. | Contextual |
|
|
28.
|
For the Site Plan view, what is
the main reason for lowering the bottom of the view range and the view depth to a negative value of
-10’-0”?
a. | To see the door and window openings
on the floor plan. | c. | To be all to see
all of the contour lines of the topography. | b. | To be able to see the colors of the materials for the
grass and concrete driveway. | d. | To see the elevation
lines. |
|
|
29.
|
When sketching the boundary of
the garage slab the edge of the slab is placed ________ in relation to the exterior
walls.
a. | at the inside edge of the
framing | c. | at the inside edge
of the gypsum board layer | b. | at the center of the framing | d. | at the outside edge of the
framing |
|
|
30.
|
What is the name of the tool
used to create the gypsum-filled area for the ceiling in Lighting Plan exercise?
a. | Masking
Region | c. | Pattern
Region | b. | Filled Region | d. | Create Region |
|
|
31.
|
What is the name of the tool
used to add missing dimensions to an existing chain of dimensions?
a. | Modify Dimension
Chain | c. | Add Dimension to
Chain | b. | Edit Witness Lines | d. | Add Witness Lines |
|
|
32.
|
When setting up the roof
framing plan view, most of the view is __________ to allow for the elements to be added to be more
visible.
a. | hidden | c. | grayed out | b. | shown in red | d. | darkened |
|
|
33.
|
In the type properties for the
stairs, each step will have a run of ______ inches minimum and a rise of ______ inches
maximum.
a. | 11; 5
1/2” | c. | 11;
7 | b. | 10;
7 | d. | 12; 7 |
|
|
34.
|
When placing a ceiling in the
project, what are the two methods that may be used?
a. | Pick inside the room; Right-click on
the room in the project browser and select “Ceiling…”. | c. | Pick the walls surrounding the room; Sketch the ceiling
outline. | b. | Pick inside the room; Sketch the ceiling
outline. | d. | Pick the walls surrounding the room;
Right-click on the room in the project browser and select
“Ceiling…”. |
|
|
35.
|
For the Residential Project,
the Project Base Point is used to ___________.
a. | locate the base height of the
topography | c. | locate the upper
right edge of the topography | b. | locate the start point of the walls of the
structure | d. | locate the lower left corner of the
boundary of the property |
|
|
36.
|
After completing the front and plan views for the Warm-Up Exercise, you are
required to place the views onto a sheet. What tab contains the tool to begin this process?
a. | Sheet Composition | c. | Load | b. | View | d. | Sheet |
|
|
37.
|
What type of view is used when drawing the projects for the initial Warm-Up
projects?
a. | drawing view | c. | drafting view | b. | beginning view | d. | model view |
|
|
38.
|
What method is used to aid in
spacing the dimensions the correct distance from the walls?
a. | Use two or three squares placed at
the midpoint of the walls. The dimension lines are then located at the edge of the
shapes. | c. | Use two or three
circles placed at the corners of the walls. The dimension lines are then located at the edge of the
shapes. | b. | Use two or three triangles placed at the corners of the walls. The dimension
lines are then located at the edge of the shapes.
| d. | Use two or three ellipses placed at the midpoint of the walls. The dimension
lines are then located at the edge of the shapes. |
|
|
39.
|
What type of line is used when drawing the views for the Warm-Up
projects?
a. | drawing line | c. | model line | b. | annotation line | d. | detail line |
|
|
40.
|
When using the Snap function, which of the following shapes indicates that the
user has snapped to the midpoint of an object?
a. | Hexagon | c. | Triangle | b. | Circle | d. | Square |
|
|
41.
|
According to the Residential
Tutorial, when at 1/4” = 1’-0” scale, dimensions are placed _____ feet from the
wall for the first dimension line and then spaced _____ feet from the first dimension line to the
second.
|
|
42.
|
When saving the drawing files for the tutorial, you should save them
_______.
a. | all of the above | c. | every 30 minutes | b. | after every major change | d. | at the beginning of the
tutorial |
|
|
43.
|
To create a new door schedule,
you must go to the ______ tool in the ______ panel to begin the process.
a. | View;
Create | c. | Create;
View | b. | Schedules; Create | d. | Schedules; View |
|
|
44.
|
When tagging the doors on the
floor plan, the final location of the tags for doors around the exterior of the house should be
________.
a. | halfway between the exterior wall
and the first dimension line | c. | on top of the door symbol | b. | to the right of the door approximately 1/16” from
the exterior of the wall
| d. | on the inside of the room/space that
the door is located |
|
|
45.
|
What view option in the
Properties box is used to show a gray scale view overlapping the current view?
a. | Underlap | c. | Underlay | b. | Overlip | d. | Overdone |
|
True/False Indicate whether the
statement is true or false.
|
|
46.
|
To create the Window Schedule
for the residential project you will start an existing schedule and modify the
fields.
|
|
47.
|
When drawing the lines for the perimeter of the house in Warm-Up #1, it is
possible to type in the length of the line at the line is being adding to the drawing?
|
|
48.
|
When placing lights on the
ceiling, the symbols shown will also provide light inside the room when the view is
rendered.
|
|
49.
|
After creating a Rectangle using the Draw panel tool, it may be moved by picking
on only one of the four lines.
|
|
50.
|
Room tags are placed before the
room is created.
|