Pre-Architecture Final Exam

Multiple Choice
Identify the choice that best completes the statement or answers the question.
 

 1. 

What is clicked first to modify the location of the object when using a dimension that has been used to annotate the size/location?
a.
The extension line that is attached to the object.
c.
The dimension line that is controlling the size/location of the object.
b.
The object to be modified.
d.
The dimension text of the dimension that is controlling the size/location of the object.
 

 2. 

After creating the door schedule, you will need to add fields to the schedule. Which of the following is not one of the fields used in the door schedule?
a.
Family
c.
Count
b.
Thickness
d.
Head
 

 3. 

If you are having trouble placing the ceiling in a room, this may be due to _______.
a.
incorrect height of the floor
c.
incorrect height of the walls
b.
incorrect ceiling material
d.
incorrect thickness of the floor
 

 4. 

What is the name of the tool and option used to create the raised concrete platform in the garage?
a.
Component, Create Platform
c.
Component, Concrete
b.
Component, Model In-Place
d.
Component, Place a Component
 

 5. 

To create the custom counter top, what is the basic sequence of steps and tools used? (Not all steps and tools are shown.)
a.
Component tool, choose the Family Category, Model In-Place, Extrusion Tool, draw the shape, click the Green Check
c.
Model In-Place, Component tool, choose the Family Category, Extrusion Tool, draw the shape, click the Green Check
b.
Component tool, Model In-Place, Extrusion Tool, choose the Family Category, draw the shape, click the Green Check
d.
Component tool, Model In-Place, choose the Family Category, Extrusion Tool, draw the shape, click the Green Check
 

 6. 

What is the name of the tool in the Manage tab, Settings panel that would be selected to remove the 0’ in front of the value for linear dimensions that are less than one foot?
a.
Suppress feet display
c.
Calculated
b.
Project Units
d.
Remove Zero
 

 7. 

What is the name of the tool used to create the concrete driveways and walkways on the surface of the topography?
a.
Pad
c.
Subregion
b.
Subsurface
d.
Region
 

 8. 

When adding a field to the door schedule that is not one of the available fields, you must create your own. To start this process what is the name of the button that you will click first?
a.
Add Field…
c.
Calculated Value…
b.
Add Parameter…
d.
Add -->
 

 9. 

The name of the tool used to quickly join to intersecting lines together is called the _________ tool.
a.
join line
c.
mirror
b.
move
d.
trim/extend to corner
 

 10. 

When calculating the square footage totals for the room finish schedule, the _______ checkbox in the _________ tab must be check first.
a.
Calculate totals; Fields
c.
Calculate totals; Appearance
b.
Calculate totals; Formatting
d.
Calculate area; Filter
 

 11. 

When creating the front door for the Warm-Up Exercise #1, two hidden lines are required. What snap mode is used to help place the left endpoint of the line exactly at the halfway point?
a.
Equalpoint
c.
Endpoint
b.
Midpoint
d.
Halfpoint
 

 12. 

When adding stairs to the project the first point is located at the _______ of the stairs.
a.
bottom
c.
middle
b.
top
 

 13. 

When adding the railings for an existing stair, the ________ tool is used to make sure that the railing will follow the slope of the stairs.
a.
Pick Existing Host
c.
Pick Stair
b.
Pick New Host
d.
Select Old Host
 

 14. 

The default cut plane setting for a reflected ceiling plan is set to _______ above the associated floor level.
a.
10’-0”
c.
7’-6”
b.
4’-0”
d.
8’-6”
 

 15. 

Prior to placing the footers around the edge of the slabs, you must first load a _______ from the families folder on the network drive.
a.
drawing
c.
symbol
b.
slab type
d.
profile
 

 16. 

The template file that is used for the first Warm-Up exercise is ________.
a.
Commercial Template
c.
Residential Template
b.
Construction Template
d.
Default
 

 17. 

What dialog box contains the setting to change the Elevation Swing to a hidden line style for all elevation views in the project?
a.
Object Styles
c.
Visibility/Graphics Overrides
b.
Additional Settings
d.
Manage
 

 18. 

Refer to Warm-Up Exercise #2 when answering this question. What tool is used to quickly copy the upper left corner of the object to the correct location on the upper right corner?
a.
Copy – Draw Axis
c.
Move
b.
Mirror – Pick Axis
d.
Mirror – Draw Axis
 

 19. 

When creating the interior elevation view of the stairs and railing, what must be done to see the portion of the stairs that located behind the wall?
a.
The graphics for the wall are to be overridden so that it will be placed behind the stairs.
c.
The graphics for the wall are to be overridden so that it will be transparent.
b.
The graphics for the stairs are to be overridden so that it will be transparent.
d.
The graphics for the wall are to be overridden so that it will be hidden.
 

 20. 

What tab contains the tool to place dimensions on the drawing.
a.
Annotate
c.
Architecture
b.
Analyze
d.
Dimension
 

 21. 

When adding kitchen cabinetry to the project, what should you do if the cabinet size is not available in the family choices?
a.
Create a new size by editing the size in the Type Properties dialog box.
c.
Download a family with the correct size from the Revit family folders.
b.
Download a family with the correct size from the bimobject.com site.
d.
Create a new size by editing the size in the Project Browser.
 

 22. 

When creating a room from two spaces such as the Living Room and Family Room, you must include a _________ line to separate the spaces.
a.
Room Separator
c.
Room Divider
b.
Room Spacer
d.
Room Segmenter
 

 23. 

The default material for the topography is _______.
a.
Concrete
c.
Earth
b.
Water
d.
Grass
 

 24. 

The name of the tool used to connect a line to another line without affecting the second line/element is called the _________ tool.
a.
Trim/Extend Single Element
c.
Trim/Extend to corner
b.
Array
d.
Mirror
 

 25. 

When dimensioning the exterior walls of the house, the witness lines are located at the _________.
a.
inside face of core
c.
outside face of wall
b.
outside face of core
d.
center of the core
 

 26. 

In the Draw panel, what tool is used to place a triangle based on the distance from the center to one of the corners?
a.
Edges Polygon
c.
Circumscribed Polygon
b.
Corner Polygon
d.
Inscribed Polygon
 

 27. 

When using a tool in Revit, sometimes a green tab will appear with specific commands related to the tool. This tab is known as a(n) _________ tab.
a.
Helpful
c.
Specific
b.
Assistance
d.
Contextual
 

 28. 

For the Site Plan view, what is the main reason for lowering the bottom of the view range and the view depth to a negative value of -10’-0”?
a.
To see the door and window openings on the floor plan.
c.
To be all to see all of the contour lines of the topography.
b.
To be able to see the colors of the materials for the grass and concrete driveway.
d.
To see the elevation lines.
 

 29. 

When sketching the boundary of the garage slab the edge of the slab is placed ________ in relation to the exterior walls.
a.
at the inside edge of the framing
c.
at the inside edge of the gypsum board layer
b.
at the center of the framing
d.
at the outside edge of the framing
 

 30. 

What is the name of the tool used to create the gypsum-filled area for the ceiling in Lighting Plan exercise?
a.
Masking Region
c.
Pattern Region
b.
Filled Region
d.
Create Region
 

 31. 

What is the name of the tool used to add missing dimensions to an existing chain of dimensions?
a.
Modify Dimension Chain
c.
Add Dimension to Chain
b.
Edit Witness Lines
d.
Add Witness Lines
 

 32. 

When setting up the roof framing plan view, most of the view is __________ to allow for the elements to be added to be more visible.
a.
hidden
c.
grayed out
b.
shown in red
d.
darkened
 

 33. 

In the type properties for the stairs, each step will have a run of ______ inches minimum and a rise of ______ inches maximum.
a.
11; 5 1/2”
c.
11; 7
b.
10; 7
d.
12; 7
 

 34. 

When placing a ceiling in the project, what are the two methods that may be used?
a.
Pick inside the room; Right-click on the room in the project browser and select “Ceiling…”.
c.
Pick the walls surrounding the room; Sketch the ceiling outline.
b.
Pick inside the room; Sketch the ceiling outline.
d.
Pick the walls surrounding the room; Right-click on the room in the project browser and select “Ceiling…”.
 

 35. 

For the Residential Project, the Project Base Point is used to ___________.
a.
locate the base height of the topography
c.
locate the upper right edge of the topography
b.
locate the start point of the walls of the structure
d.
locate the lower left corner of the boundary of the property
 

 36. 

After completing the front and plan views for the Warm-Up Exercise, you are required to place the views onto a sheet. What tab contains the tool to begin this process?
a.
Sheet Composition
c.
Load
b.
View
d.
Sheet
 

 37. 

What type of view is used when drawing the projects for the initial Warm-Up projects?
a.
drawing view
c.
drafting view
b.
beginning view
d.
model view
 

 38. 

What method is used to aid in spacing the dimensions the correct distance from the walls?
a.
Use two or three squares placed at the midpoint of the walls. The dimension lines are then located at the edge of the shapes.
c.
Use two or three circles placed at the corners of the walls. The dimension lines are then located at the edge of the shapes.
b.
Use two or three triangles placed at the corners of the walls. The dimension lines are then located at the edge of the shapes.
d.
Use two or three ellipses placed at the midpoint of the walls. The dimension lines are then located at the edge of the shapes.
 

 39. 

What type of line is used when drawing the views for the Warm-Up projects?
a.
drawing line
c.
model line
b.
annotation line
d.
detail line
 

 40. 

When using the Snap function, which of the following shapes indicates that the user has snapped to the midpoint of an object?
a.
Hexagon
c.
Triangle
b.
Circle
d.
Square
 

 41. 

According to the Residential Tutorial, when at 1/4” = 1’-0” scale, dimensions are placed _____ feet from the wall for the first dimension line and then spaced _____ feet from the first dimension line to the second.
a.
3; 2
c.
4; 2
b.
2; 1
d.
2; 3
 

 42. 

When saving the drawing files for the tutorial, you should save them _______.
a.
all of the above
c.
every 30 minutes
b.
after every major change
d.
at the beginning of the tutorial
 

 43. 

To create a new door schedule, you must go to the ______ tool in the ______ panel to begin the process.
a.
View; Create
c.
Create; View
b.
Schedules; Create
d.
Schedules; View
 

 44. 

When tagging the doors on the floor plan, the final location of the tags for doors around the exterior of the house should be ________.
a.
halfway between the exterior wall and the first dimension line
c.
on top of the door symbol
b.
to the right of the door approximately 1/16” from the exterior of the wall
d.
on the inside of the room/space that the door is located
 

 45. 

What view option in the Properties box is used to show a gray scale view overlapping the current view?
a.
Underlap
c.
Underlay
b.
Overlip
d.
Overdone
 

True/False
Indicate whether the statement is true or false.
 

 46. 

To create the Window Schedule for the residential project you will start an existing schedule and modify the fields.
 

 47. 

When drawing the lines for the perimeter of the house in Warm-Up #1, it is possible to type in the length of the line at the line is being adding to the drawing?
 

 48. 

When placing lights on the ceiling, the symbols shown will also provide light inside the room when the view is rendered.
 

 49. 

After creating a Rectangle using the Draw panel tool, it may be moved by picking on only one of the four lines.
 

 50. 

Room tags are placed before the room is created.
 



 