True/False Indicate whether the
statement is true or false.
|
|
1.
|
To create the Window Schedule
for the residential project you will start an existing schedule and modify the
fields.
|
|
2.
|
Room tags are placed before the
room is created.
|
|
3.
|
When placing lights on the
ceiling, the symbols shown will also provide light inside the room when the view is
rendered.
|
Multiple Choice Identify the
choice that best completes the statement or answers the question.
|
|
4.
|
To create a new door schedule,
you must go to the ______ tool in the ______ panel to begin the process.
a. | Create;
View | c. | View;
Create | b. | Schedules; Create | d. | Schedules; View |
|
|
5.
|
After creating the door
schedule, you will need to add fields to the schedule. Which of the following is not one of the
fields used in the door schedule?
a. | Family | c. | Thickness | b. | Head | d. | Count |
|
|
6.
|
When creating a room from two
spaces such as the Living Room and Family Room, you must include a _________ line to separate the
spaces.
a. | Room
Divider | c. | Room
Separator | b. | Room Divisor | d. | Room Segmenter |
|
|
7.
|
When calculating the square
footage totals for the room finish schedule, the _______ checkbox in the _________ tab must be check
first.
a. | Calculate totals;
Appearance | c. | Calculate totals;
Formatting | b. | Calculate totals; Fields | d. | Calculate area; Filter |
|
|
8.
|
For the Site Plan view, what is
the main reason for lowering the bottom of the view range and the view depth to a negative value of
-10’-0”?
a. | To see the door and window openings
on the floor plan. | c. | To be all to see
all of the contour lines of the topography. | b. | To see the ground level of the
design. | d. | To be able to see the colors of the materials for the
grass and concrete driveway. |
|
|
9.
|
The default material for the
topography is _______.
a. | Concrete | c. | Water | b. | Grass | d. | Earth |
|
|
10.
|
What is the name of the tool
used to create the concrete driveways and walkways on the surface of the
topography?
a. | Subregion | c. | Subsurface | b. | Region | d. | Pad |
|
|
11.
|
When adding stairs to the
project the first point is located at the _______ of the stairs.
|
|
12.
|
In the type properties for the
stairs, each step will have a run of ______ inches minimum and a rise of ______ inches
maximum.
a. | 11; 7 | c. | 12; 7 | b. | 11; 5 1/2” | d. | 10; 7 |
|
|
13.
|
When setting up the roof
framing plan view, most of the view is __________ to allow for the elements to be added to be more
visible.
a. | hidden | c. | shown in red | b. | darkened | d. | grayed out |
|
|
14.
|
When adding the railings for an
existing stair, the ________ tool is used to make sure that the railing
will follow the slope of the stairs.
a. | Pick Existing
Host | c. | Pick
Stair | b. | Pick New Host | d. | Select Old Host |
|
|
15.
|
When creating the interior
elevation view of the stairs and railing, what must be done to see the portion of the stairs that
located behind the wall?
a. | The graphics for the wall are to be
overridden so that it will be placed behind the stairs. | c. | The graphics for the wall are to be overridden so that it will be
hidden. | b. | The graphics for the stairs are to be overridden so that it will be
transparent. | d. | The graphics for the wall are to be
overridden so that it will be transparent. |
|
|
16.
|
The default cut plane setting
for a reflected ceiling plan is set to _______ above the associated floor level.
a. | 4’-0” | c. | 8’-6” | b. | 7’-6” | d. | 10’-0” |
|
|
17.
|
When placing a ceiling in the
project, what are the two methods that may be used?
a. | Pick the walls surrounding the room;
Sketch the ceiling outline. | c. | Pick inside the room; Right-click on the room in the project browser and
select “Ceiling…”. | b. | Pick inside the room; Sketch the ceiling
outline. | d. | Pick the walls surrounding the room;
Right-click on the room in the project browser and select
“Ceiling…”. |
|
|
18.
|
If you are having trouble
placing the ceiling in a room, this may be due to _______.
a. | incorrect ceiling
material | c. | incorrect height
of the floor | b. | incorrect height of the walls | d. | incorrect thickness of the floor |
|
|
19.
|
What is the name of the tool in
the Manage tab, Settings panel that would be selected to remove the 0’ in front of the value
for linear dimensions that are less than one foot?
a. | Project
Units | c. | Suppress feet
display | b. | Calculated | d. | Remove Zero |
|
|
20.
|
When adding a field to the door
schedule that is not one of the available fields, you must create your own. To start this process
what is the name of the button that you will click first?
a. | Add
Parameter… | c. | Add
--> | b. | Calculated Value… | d. | Add Field… |
|