Multiple Choice Identify the
choice that best completes the statement or answers the question. Note that True/False Questions are
treated as multiple choice.
|
|
1.
|
To create a new door schedule, you must go to the ______ tool in the ______
panel to begin the process.
a. | Create; View | c. | View; Create | b. | Schedules; Create | d. | Schedules; View |
|
|
2.
|
After creating the door schedule, you will need to add fields to the schedule.
Which of the following is not one of the fields used in the door schedule?
a. | Family | c. | Thickness | b. | Head | d. | Count |
|
|
3.
|
When adding a field to the door schedule that is not one of the available
fields, you must create your own. To start this process what is the name of the button that you will
click first?
a. | Add Parameter… | c. | Add --> | b. | Calculated Value… | d. | Add
Field… |
|
|
4.
|
The font height for the words “Door Schedule” is ______.
a. | 1/8” | c. | 1/4” | b. | 9/64” | d. | 3/16” |
|
|
5.
|
What tab in the Schedule Properties dialog box contains the option that controls
whether the schedule shows only one door type per line?
a. | Formatting | c. | Fields | b. | Sorting/Grouping | d. | Appearance |
|
|
6.
|
What is the name of the tool in the Manage tab, Settings panel that would be
selected to remove the 0’ in front of the value for linear dimensions that are less than one
foot?
a. | Project Units | c. | Suppress feet display | b. | Calculated | d. | Remove Zero |
|
|
7.
|
What tab in the Schedule Properties dialog box contains the option that controls
whether the schedule shows only a blank line before the beginning of the data?
a. | Formatting | c. | Fields | b. | Sorting/Grouping | d. | Appearance |
|
|
8.
|
To create the Window Schedule for the residential project you will start an
existing schedule and modify the fields.
|
|
9.
|
Room tags are placed before the room is created.
|
|
10.
|
When creating a room from two spaces such as the Living Room and Family Room,
you must include a _________ line to separate the spaces.
a. | Room Divider | c. | Room Creator | b. | Room Separator | d. | Room Segmenter |
|
|
11.
|
When calculating the square footage totals for the room finish schedule, the
_______ checkbox in the _________ tab must be check first.
a. | Calculate totals; Appearance | c. | Calculate totals;
Formatting | b. | Calculate totals; Fields | d. | Calculate area; Filter |
|
|
12.
|
The rooms must be created and tagged before a room legend can be created.
|